About the Project
MaRS Trans USA worked on a large Water Treatment Plant project in Florida covering 1,60,000 sq.m. The project required a high level of accuracy with LOD 400 standards. Our team used advanced tools like Revit and AutoCAD to develop detailed BIM models.
The project was completed during 2015–16 and included complex structural, mechanical, and piping systems. Our Scan to BIM process helped in creating a digital representation of the existing facility. This model supported better coordination and planning for future upgrades.
Project Details
Area: 1,00,000 sq. m.
Year: 2010-11
Software Used: Revit, AutoCAD, Navisworks
What Did MaRS Do
We converted scan data into a precise BIM model for project execution.
We converted the scanned point cloud data into an accurate BIM model using Revit. Every structural and MEP detail was captured with high precision.
We created models at LOD 400, covering all structural, architectural, and MEP components. This level supported construction-level detailing.
Our team performed clash detection and resolved issues between structural and MEP systems. This reduced design errors and improved project efficiency.
The Results
The project delivered a complete and accurate digital model of the water treatment plant.

















