Data Center

About the Project

MaRS Trans USA worked on the Data Center Project in Dallas, TX with a total area of 30,000 sq.m. The project required LOD 400 BIM modeling to deliver construction-ready details. Our team used Revit and Navisworks to create precise and well-coordinated models.

The project was completed during 2020–21 and included architectural, structural, and MEP systems. The BIM model supported design validation, construction planning, and system integration. It also provided accurate information for future facility operations.

Project Details

Area: 30,000 sq. m.

LOD: LOD 400

Year: 2020-21

Location: Dallas, TX

Software Used: Revit, Navisworks

What Did MaRS Do

 We delivered a construction-ready BIM model for the data center.

LOD 400 BIM Modeling

We created detailed models covering architecture, structure, and MEP systems.

Clash Detection and Coordination

We used Navisworks to identify clashes and resolve them before construction.

Construction Documentation

We prepared coordinated drawings and documents to guide the project teams.

The Results

 The project delivered a precise and coordinated BIM model for execution and operations.

100% accurate LOD 400 model
30% fewer design conflicts
Improved project planning by 25%