Dallas, Texas

Data Center BIM Project

Project Type

Data Center / Mission Critical

Sector

Technology & Critical Infrastructure

Project Area

30,000 sq. m.

LOD

LOD 400

Year Completed

2020–21

Project Overview

The Data Center BIM Project is a 30,000 sq. m. mission-critical facility in Dallas, Texas, designed to support essential, always-on operations for multiple organizations. The goal was a resilient, scalable data center built to the highest standards of efficiency, security and uptime.

MaRS BIM Solutions delivered a LOD 400 BIM model in Revit, coordinated in Navisworks, that captured every critical element of the facility, from power distribution and cooling to the dense MEP services running through the data halls and support spaces. Modeling at this level of detail let the team spot conflicts early in design, cut installation errors on site and keep the program moving.

Working closely with the architects, engineers and contractors, our team provided continuous coordination, detailed 3D views and as-built documentation, producing a model that streamlined construction and set up the facility for efficient long-term operation and maintenance.

Data Center BIM Project – BIM model overview

Why This Project Needed BIM?

01

Dense Power & Cooling Systems

Power distribution, cooling equipment, chilled water and containment all compete for the same space in a data center. Only a detailed 3D model could prove every system fits before installation.

02

Zero Tolerance for Rework

Design errors found on site cause delays and unexpected costs. LOD 400 modeling let conflicts be found and fixed in the model, long before crews mobilized.

03

Many Trades, One Schedule

Architects, engineers and multiple contractors had to stay aligned. A shared, federated model gave every stakeholder the same up-to-date picture of the design.

04

Accurate Site Conditions

Initial designs did not fully reflect actual site conditions. The BIM model was updated to match reality so routing and equipment placement stayed buildable.

05

Reliable Progress Tracking

Without accurate data, tracking progress is guesswork. The model gave the team a dependable reference for quantities, status and coordination sign-off.

06

Long-Term Facility Management

A data center runs for decades. As-built, asset-rich BIM data supports maintenance, equipment replacement and future capacity expansion.

Scope of Work

  • LOD 400 BIM Modeling in Revit for Architectural, Structural and MEP Systems
  • Power Distribution and Electrical BIM Modeling
  • Cooling, Mechanical and Utilities Modeling
  • Multi-Discipline Clash Detection and Coordination in Navisworks
  • Detailed 3D Views and Renderings for Stakeholder Reviews
  • As-Built Documentation for Facility Management
Scope of work

Visual Highlights

Coordinated Building Model BIM view 1
Coordinated Building Model BIM view 2
Coordinated Building Model BIM view 3
Coordinated Building Model BIM view 4
Coordinated Building Model BIM view 5
Coordinated Building Model BIM view 6

Key Challenges

Conflicts between electrical, mechanical and structural elements, if left in the drawings, would surface on site and push back installation and commissioning.
Models without fabrication-level detail risk wrong quantities and rework, creating cost overruns on an already capital-intensive facility.
Early design information did not fully match conditions on site, so routing and equipment layouts needed to be validated against reality.
With several trades working in tight spaces, coordination between contractors took longer than planned and progress was hard to track without accurate data.

Our Project Execution Strategy

We built a detailed LOD 400 model of architecture, structure and MEP, precise enough for construction and future maintenance.
Federated models were run through Navisworks clash detection, and conflicts were resolved with the design team before they could reach the field.
Detailed 3D views and renderings helped owners, engineers and contractors visualize the design and agree on solutions quickly.
As-built conditions were documented in the model, giving the owner an accurate reference for facility management and future expansion.