Edge-on-Hudson
Modernizing Urban Transit Infrastructure through LOD 400 MEPF BIM coordination, clash detection, and Revit modeling.
New YorkCoordinated BIM for GMP manufacturing, cleanrooms and laboratories — with pressure zoning, HVAC, process utilities and interstitial spaces resolved before construction.
Share your scope and drawings. Our team will reply with a fixed-price proposal within 24 hours.
Your details stay private. We reply within one business day.
Trusted by 280+ AEC firms worldwide















50 River St, Sleepy Hollow, NY 10591Edge-on-Hudson is a $1 billion transit-oriented mixed-use development transforming the former 70-acre General Motors assembly plant site in Sleepy Hollow, New York, located just 25 miles north of Manhattan along the Hudson River.
Pharmaceutical and life-science facilities carry some of the highest MEP densities of any building type. Cleanroom HVAC, process piping, pure water, clean steam, exhaust and electrical services all converge in interstitial spaces above controlled rooms.
Our BIM specialists model every system in coordination, respect room classifications and flows, and produce documentation that supports construction, qualification and long-term operations.
Controlled environments leave no room for coordination errors. Our models address these challenges before construction starts.
High air-change rates, HEPA filtration and large ductwork in limited interstitial space.
Purified water, WFI, clean steam and process gases with slope, drainability and material requirements.
Pressure cascades, airlocks and personnel and material flows that must remain intact.
Service access from outside classified areas to avoid disrupting production.
Accurate, traceable documentation to support commissioning and qualification.
Upgrades inside operating facilities where shutdown windows are short.
Every life-science building type has its own zoning, utility and containment requirements. We model to match.




Send them over. We will review the scope and come back with a fixed-price proposal and delivery schedule within 24 hours — no obligation.
Coordinated, construction-ready BIM delivered for complex projects across the US.
See how our BIM teams have supported architects, engineers and contractors on real projects.
A structured workflow from kickoff to handover, with QA at every stage — so your team reviews finished, coordinated output, not work in progress.
Our MEP specialists understand coordinated building systems in controlled environments, so your cleanrooms, labs and utilities are coordinated, maintainable and ready for qualification.
Honest words from the people behind our continued success
Frequently Asked About Pharmaceutical BIM Services
Share your drawings and project scope. We will review and send a proposal within 24 hours.